Summer has flown by, and we have (of course) been very busy with getting our house and life ready for baby to arrive! Chad tackled the coordination of 3 big projects (and also some little ones) in July while I was finishing up work at PrideStaff in preparation for maternity leave....
Air Conditioning!
Believe it or not, we have spent 9 years in this house with no AC, only a super-efficient swamp cooler. It didn't seem to be that much of an inconvenience with both of us working and spending the hottest part of the day in an air-conditioned office/classroom. There were only a few days/evenings out of the year that ever felt unbearable. However, with a baby on the way, we both agreed this project needed to happen and FAST. And so it did, just in time for my final 6 weeks or so of pregnancy. It feels wonderful to bask in the cold air and not worry about guests getting too hot. All for the low, low price of $9,974.00!
Oh, and while they were at it they put in central heat, thus the removal of our very trendy wall furnace -- see the second pic below. Thankfully they closed up the giant hole in the wall; now we are in need of having it textured and painted.

Back Patio Cover
We enlisted the help of one of our friends to build us an arbor over our back patio. He did a great job -- see artistic photo below, shot thru the panes of the back door -- this is because it's 100+ degrees out and I'm not about to go out there with this new AC keeping me cool!
We are definitely making progress on our backyard -- our table and chairs also has a new umbrella and new cushions, and we're enjoying spending cool evenings outside. Chad is also (currently) working on a new side gate. After that we need to find the right canvas shade to go over the arbor, get some outdoor lighting installed, paint the back of the house, plant trees, etc. Eventually I would love a vegetable garden on the side of the house and Chad wants to install a fountain. We'll have lots to do in Spring, once we are settled into our new life as Mommy & Daddy.
Baby's Room Construction
We decided that, due to lack of closet space in our very small home, we needed a serious storage solution for the baby's room since babies are notorious for requiring lots of STUFF. So we hired a guy to help with a built-in wall unit against the north side of the room. Below are pics of the finished product, which we love! At this point the nursery is almost completely done, and so I will post a variety of pics separately as soon as I can. Call these a teaser!
In addition to the cabinetry, Chad coordinated the painting and has worked hard to install the ceiling fan, blinds, curtain rods, etc. Next up is assembling the crib!
Other Misc House Stuff
We've been working on a minor "face lift" for our bathroom over the past 6-9 months or so, which has included new paint, new fixtures, a new cabinet, and new blinds. I think we are how done with this project, minus a few paint touch-ups that still need to be done. I would love to post before and after pics but I don't have any of the "before" handy, and, well, I am 39 weeks pregnant so not very motivated to search for them. I will update this post with an "after" pic (maybe) the next time the bathroom is presentable enough to photograph.
We also spent last Saturday FINALLY cleaning the garage. We have not had a car in it since the baby's room project got started, when all the furniture had to come out of our guest room. Add to that all the boxes and gifts from 3 baby showers, plus anything else we needed out of the way while so much was "in transition" -- it got to the point where I could not walk through it with this giant belly. It was fantastic to take a huge load to Goodwill and get everything else situated, cleaned, swept, etc. My car is BACK IN!
